Karora Resources Intersects 29.8 g/t Gold Over 19.0 Metres and 27.3 g/t Gold Over 15.0 Metres from Initial Drilling at Spargos Project

Karora Resources Intersects 29.8 g/t Gold Over 19.0 Metres and 27.3 g/t Gold Over 15.0 Metres from Initial Drilling at Spargos Project

Highlights: Initial drill results 1 within 100 metres of the surface have intersected new high grade gold intercepts at the Spargos Project. These include: SPRC0026: 29.8 g/t over 19.0 metres, including 99.5 g/t over 5.0 metres

SPRC0012: 27.3 g/t over 15.0 metres, including 168.0 g/t over 1.3 metres

SPRC0019: 8.0 g/t over 19.0 metres, including 20.6 g/t over 2.0 metres

SPRC0028: 29.8 g/t over 3.0 metres SPRC0032: 8.7g/t over 16.0 metres 1. Downhole intervals. Estimated true widths are approximately 70% of the downhole interval. Two RC drill rigs now actively drilling at Spargos A new Spargos Mineral Resource is expected to be included in the upcoming fourth quarter mineral resource and reserve update Paul Andre Huet, Chairman & CEO, commented: "Our exploration drilling program at Spargos is off to a tremendous start. I am thrilled to share our new drill results with […]

About the author: StockMan
Tell us something about yourself.
Posting Guidelines
Do
  • Do contribute something to the discussion
  • Do post factual information, analysis and your view on company valuations
  • Do disclose if you have an interest in a security
  • Do take our Terms of Use seriously
Do Not
  • Do not make low-content posts, unsubstantiated ramps or untruthful/misleading statements
  • Do not complain about a post unless you have reported it first, and not on the forum.
  • Do not post financial advice
  • Do not advertise or post sponsored content

Get involved!

Get Connected!

Come and join our community. Expand your network and get to know new people!

Comments

No comments yet