Fission Uranium Focuses on Resource Expansion and Project De-risking with 43-Hole Drill Program

Fission Uranium Focuses on Resource Expansion and Project De-risking with 43-Hole Drill Program

Drill Program Highlights

Resource Indicated Expansion: R780E Zone (Winter 2021) Drilling expected to commence Q1, 2021

Drilling will focus on the eastern portion of the R780E, between lines 900E and 1125E where a large portion of the mineralization is presently classified as Inferred and the potential to intersect multiple stacked zones is high.

Drilling will include both infill and step-outs from known mineralization and at a spacing of ~15m x 20m (horizontal / vertical) to allow for conversion from Inferred to Indicated. Drill holes on and around line 900E have the potential to intersect the projected plunge of the high-grade core at R780E. Resource Indicated Expansion: R840W Zone (Summer 2021) Drilling expected to be completed in Q3, 2021 The R840W zone is located ~500m west of Patterson Lake. It is the 2 nd largest of the mineralized zones after the R780E zone and due to its predominantly Inferred […]

About the author: StockMan
Tell us something about yourself.
Posting Guidelines
Do
  • Do contribute something to the discussion
  • Do post factual information, analysis and your view on company valuations
  • Do disclose if you have an interest in a security
  • Do take our Terms of Use seriously
Do Not
  • Do not make low-content posts, unsubstantiated ramps or untruthful/misleading statements
  • Do not complain about a post unless you have reported it first, and not on the forum.
  • Do not post financial advice
  • Do not advertise or post sponsored content

Get involved!

Get Connected!

Come and join our community. Expand your network and get to know new people!

Comments

No comments yet