3,000 Metre Drill Program Started on CanAlaska's High-Grade Manibridge Nickel Project

3,000 Metre Drill Program Started on CanAlaska’s High-Grade Manibridge Nickel Project

Multiple Targets Within and Near Historical Mineralized Nickel Zone

CanAlaska Has Ongoing Uranium and Nickel Exploration Activity on Multiple Projects

Vancouver, British Columbia–(Newsfile Corp. – March 8, 2022) – CanAlaska Uranium Ltd. (TSXV: CVV ) (OTCQB: CVVUF ) (FSE: DH7N ) ("CanAlaska" or the "Company") is pleased to announce that a planned 3,000 m drill program has started on the high-grade Manibridge nickel project in the Thompson Nickel Belt, Manitoba (Figure 1). Drilling will focus near the past-producing Manibridge Nickel Mine that produced 1.3 million tonnes at an average grade of 2.55% nickel and 0.27% copper from 1971 to 1977. Figure 1

Nine drill holes, for a total of 3,000 m, are planned within one kilometre of the past-producing high-grade nickel mine. The program is designed to test several different target concepts that will provide new geological information to help advance the Manibridge project to the next […]

About the author: StockMan
Tell us something about yourself.
Posting Guidelines
Do
  • Do contribute something to the discussion
  • Do post factual information, analysis and your view on company valuations
  • Do disclose if you have an interest in a security
  • Do take our Terms of Use seriously
Do Not
  • Do not make low-content posts, unsubstantiated ramps or untruthful/misleading statements
  • Do not complain about a post unless you have reported it first, and not on the forum.
  • Do not post financial advice
  • Do not advertise or post sponsored content

Get involved!

Get Connected!

Come and join our community. Expand your network and get to know new people!

Comments

No comments yet