( OTCQB: FDCFF ) ("Forum" or "the Company") is pleased to announce that the Company is mobilizing a drill and crew to commence drilling on its 100% owned Wollaston uranium project by the end of the month. Drilling last winter on the project was successful in identifying the Gizmo zone with uranium grades up to 0.21% U3O8 intersected in one of four holes drilled on the target exhibiting strong alteration and geochemical values. Permits are in place and approximately 3,000m of drilling in 12 holes are planned on various targets that were developed by the recent airborne magnetic and electromagnetic (EM) survey flown over the project in August. The Wollaston project is well located 10km south of Cameco’s Rabbit Lake Uranium Mill and 30km south of Orano/Denison’s McClean Lake Uranium Mill in the northeastern Athabasca Basin (Figure 1). Figure 1: Location Map of the Wollaston Project. Targets on the […]
Click here to view original web page at www.juniorminingnetwork.com
Posting Guidelines
- Do contribute something to the discussion
- Do post factual information, analysis and your view on company valuations
- Do disclose if you have an interest in a security
- Do take our Terms of Use seriously
- Do not make low-content posts, unsubstantiated ramps or untruthful/misleading statements
- Do not complain about a post unless you have reported it first, and not on the forum.
- Do not post financial advice
- Do not advertise or post sponsored content
Get involved!
Get Connected!
Come and join our community. Expand your network and get to know new people!
Comments